Bankstown Strategic Bus Corridor Works

Widen various road intersections to accommodate turning area for large buses. Work involves Telstra, watermain, power line and traffic signal relocation at three intersections in Bankstown and a new signalised pedestrian crossing at Chesterhill. Other works include drainage line upgrades, kerb and gutter work, road reconstruction and asphalt resheeting. Traffic control.

COMPLETION DATE: 2008
CLIENT: BANKSTOWN CITY COUNCIL
SUPERINTENDENT: ALLAN EL HASSAN – 0412 439722

Plant Hire

Celtic Civil carry a range of plant for ‘wet’ and ‘dry’ hire. All plant available for hire is under 3 years old and full service history is available. Machines are available for short and long term hire. We are a preferred supplier of plant to Railcorp NSW and all our operators are experienced working in the rail corridor.

EXCAVATOR RANGE

Excavators available for hire from 3t to 30t – including zero swing machines on rubber tracks. All excavators are fitted with ROPS/FOPS and include burst hose protection. (mine spec) Attachments: Trimble GPS, Hydraulic Breakers, Auger Drives (150mm – 900mm) Compaction Plates, Rippers, hydraulic grapples, Height & Slew restrictors & Tilt buckets.

DUMPER RANGE

We carry a range of dumpers from 6T – 40T. All dumpers are ROPS/FOPS certified. Our 10-14T range come with low ground pressure tyres ideally suited to soft ground or where minimum disturbance is required to the existing surface (i.e Golf Courses).

Burragorang Lookout Stage 1

Construction of new lookout area, new concrete paving works, installation of footings for large furniture units, installation of furniture units, asphalt and landscape works.

COMPLETION DATE: 2009
CLIENT: DEPARTMENT OF COMMERCE
SUPERINTENDENT: BARRY O HALLORAN

Seger Avenue Upgrade

Street rehabilitation on 3 streets which included removal and replacement of 900m of kerb and gutter, 500m2 of driveways, new footpaths, pit construction and drainage lines, asphalt works.

COMPLETION DATE: 2011
CLIENT: BANKSTOWN CITY COUNCIL
SUPERINTENDENT: RAY SALEAM

Depot Place Street Beautification

Install traffic calming threshold to accommodate shared traffic zone. Work included excavation works, concrete works, footpath paving, kerb and Gutter, tree planting, Street furniture installation and asphalt work.

COMPLETION DATE: 2006
CLIENT: BANKSTOWN CITY COUNCIL
SUPERINTENDENT: ALLAN EL HASSAN – 0412 439722

Woodville Golf Course Dam Construction

Construction of a new dam which included major earthwork cut and fill, construction of lime stabilised bund walls, installation of 1800 dia pipeline and associated structures/spillways.

COMPLETION DATE: 2008
CLIENT: PARRAMATTA CITY COUNCIL
SUPERINTENDENT: ANDY LING – 02 9806 5951