Construction of 240m of drainage canal (8.5m wide) in Monier Square Villawood. Work included major excavation works, concrete works including retaining walls, slab on ground, installation of 202 precast wall panels, major Telstra relocation works incl new bridge, construction of truck parking bays, dish drains, asphalt works, wire mesh fencing and landscaping.
Author: Celtic Civil Ltd
Upper Clear Paddock Creek Detention Basin
Construct 280m block retaining wall up to 4m high. Construct 80m x 3m high reinforced concrete spillway. Sandstone rip rap construction(600T). Excavation and backfilling, drainage, major sewer encasement and relocation works, 4000m2 of bush regeneration, landscaping and turfing.
COMPLETION DATE: 2009
CLIENT: FAIRFIELD CITY COUNCIL
SUPERINTENDENT: THAVA SELLATHURAI – 02 9725 0861
Sandstone Retaining Wall Villawood
Construction of a 2m high retaining wall on a section of Villawood drain (included all formwork, reinforcement fixing and concrete placement).
COMPLETION DATE: 2006
CLIENT: BANKSTOWN CITY COUNCIL
SUPERINTENDENT: ROD TAYLOR – 0407 718 962
Headwall Construction At Dural
Construct inlet and outlet head walls on twin 2.4m dia culverts under Newline Road, Dural. Work included all water diversion, excavation, formwork, reinforcement fixing and concrete placement.
COMPLETION DATE: 2009
CLIENT: INTERFLOW & RTA (NSW)
SUPERINTENDENT: TOM WHITE – 0408 746929
Harden Street Rain Garden
Construction of Raingarden using an Urban Sensitive Design (WSD) to prevent nuisance flooding to adjoining properties. Project consisted of earthworks, EPDM liner installation, bio-retention filter media placement, concrete and landscape works.
COMPLETION DATE: SEPTEMBER 2012
CLIENT: FAIRFIELD CITY COUNCIL
SUPERINTENDENT: WILLIAM MANNERS
Gross Pollutant Trap At Cabramatta
Excavate/shoring, supply and complete installation of a 6m deep P1512 CDS unit plus design and construct of a large cast insitu diversion chamber on an existing 1350mm diameter pipeline in Antonietta Street Cabramatta.
COMPLETION DATE: JUNE 2012
CLIENT: FAIRFIELD CITY COUNCIL
SUPERINTENDENT: THAVA SELLATHURAI
Greystanes Sports Ground Detention Basin
Construction of 250m of detention basin retaining walls up to 2.4m high consisting of insitu concrete foundations and walls, faced block work and 1m high structural steel frame with 35mm thick ‘Plexiglas’ infill panels. The Plexiglas panels serve a dual function; allow uninterrupted views of park for nearby residents and hold 1m in height of water during a major storm event. Other works included major intake drainage structures, twin 1200mm pipe line construction, concrete ramps, stairs and associated handrails, fencing & 2500m2 of turf reinstatement.
COMPLETION DATE: JULY 2012
CLIENT: HOLROYD CITY COUNCIL
SUPERINTENDENT: NITIN GURJAR
Excelsior Street Creek Restoration
Realignment and widening of the existing creek which include major earth work cut and fill. Reconstruction of new reinforced headwall, stacked rock retaining wall, Installation of rock riffles and rock rip rap works and Installation of Jute master thick matt for batters. Remove asbestos contaminated material.
COMPLETION DATE: 2007
CLIENT: PARRAMATTA CITY COUNCIL
SUPERINTENDENT: ANDY LING – 02 9806 5951
Byrnes Mill Seawall
Construct sandstone retaining wall (800tonne) up to 3m high, reconstruct failed section of existing seawall at Parramatta River, bulk and detailed excavation, landscaping and fencing.
COMPLETION DATE: 2008
CLIENT: PARRAMATTA CITY COUNCIL
SUPERINTENDENT: RICHARD BASS – 0414 980 627
Bridge Replacement Lansvale
Demolition of existing wooden pedestrian bridge and replace with precast box culvert bridge and topping slab and kerb. Construction of foundation slab and construction of gabion walls. Reinstatement of pavers and landscaping.