Villawood Drain Stage 6 Reconstruction

Construction of 240m of drainage canal (8.5m wide) in Monier Square Villawood. Work included major excavation works, concrete works including retaining walls, slab on ground, installation of 202 precast wall panels, major Telstra relocation works incl new bridge, construction of truck parking bays, dish drains, asphalt works, wire mesh fencing and landscaping.

COMPLETION DATE: 2006
CLIENT: BANKSTOWN CITY COUNCIL
SUPERINTENDENT: ALLAN EL HASSAN – 0412 439722

Upper Clear Paddock Creek Detention Basin

Construct 280m block retaining wall up to 4m high. Construct 80m x 3m high reinforced concrete spillway. Sandstone rip rap construction(600T). Excavation and backfilling, drainage, major sewer encasement and relocation works, 4000m2 of bush regeneration, landscaping and turfing.

COMPLETION DATE: 2009
CLIENT: FAIRFIELD CITY COUNCIL
SUPERINTENDENT: THAVA SELLATHURAI – 02 9725 0861

Harden Street Rain Garden

Construction of Raingarden using an Urban Sensitive Design (WSD) to prevent nuisance flooding to adjoining properties. Project consisted of earthworks, EPDM liner installation, bio-retention filter media placement, concrete and landscape works.

COMPLETION DATE: SEPTEMBER 2012
CLIENT: FAIRFIELD CITY COUNCIL
SUPERINTENDENT: WILLIAM MANNERS

Gross Pollutant Trap At Cabramatta

Excavate/shoring, supply and complete installation of a 6m deep P1512 CDS unit plus design and construct of a large cast insitu diversion chamber on an existing 1350mm diameter pipeline in Antonietta Street Cabramatta.

COMPLETION DATE: JUNE 2012
CLIENT: FAIRFIELD CITY COUNCIL
SUPERINTENDENT: THAVA SELLATHURAI

Greystanes Sports Ground Detention Basin

Construction of 250m of detention basin retaining walls up to 2.4m high consisting of insitu concrete foundations and walls, faced block work and 1m high structural steel frame with 35mm thick ‘Plexiglas’ infill panels. The Plexiglas panels serve a dual function; allow uninterrupted views of park for nearby residents and hold 1m in height of water during a major storm event. Other works included major intake drainage structures, twin 1200mm pipe line construction, concrete ramps, stairs and associated handrails, fencing & 2500m2 of turf reinstatement.

COMPLETION DATE: JULY 2012
CLIENT: HOLROYD CITY COUNCIL
SUPERINTENDENT: NITIN GURJAR

Excelsior Street Creek Restoration

Realignment and widening of the existing creek which include major earth work cut and fill. Reconstruction of new reinforced headwall, stacked rock retaining wall, Installation of rock riffles and rock rip rap works and Installation of Jute master thick matt for batters. Remove asbestos contaminated material.

COMPLETION DATE: 2007
CLIENT: PARRAMATTA CITY COUNCIL
SUPERINTENDENT: ANDY LING – 02 9806 5951

Byrnes Mill Seawall

Construct sandstone retaining wall (800tonne) up to 3m high, reconstruct failed section of existing seawall at Parramatta River, bulk and detailed excavation, landscaping and fencing.

COMPLETION DATE: 2008
CLIENT: PARRAMATTA CITY COUNCIL
SUPERINTENDENT: RICHARD BASS – 0414 980 627

Bridge Replacement Lansvale

Demolition of existing wooden pedestrian bridge and replace with precast box culvert bridge and topping slab and kerb. Construction of foundation slab and construction of gabion walls. Reinstatement of pavers and landscaping.

COMPLETION DATE: 2007
CLIENT: BANKSTOWN CITY COUNCIL
SUPERINTENDENT: GREG JENKYNS