Flood Mitigation works Project for VBA JV and RMS. Replace the existing drainage system on the south side of Newbridge Road, Chipping Norton, about 100m east of Davy Robinson Drive. The works consist of constructing 80m box culvert connecting existing box culvert crossing Newbridge road to a new headwall on the bank of the Georges River.

COMPLETION DATE: 2018
CLIENT: VBA JV