Stabilisation works for a section of embankment on Barrenjoey Road at Bilgola. Works include but not just limited to;
- Complex Traffic Management due to narrow road and works location.
- The construction of a micro pile wall approximately 40 metres long.
- Installation of 53 x 225mm cased micro piles up to 11m deep in sandstone.
- Construction of a capping beam along the top of the micro-pile wall.
- Reinstatement of new guardrail.
- Installation of a new surface drainage and grated driveway access at Barrenjoey Road.
- 200 square metres of vegetation cleared to facilitate the construction of the proposed slope stabilisation work.
- Line Marking & Signage.
- All works completed at night.