The works carried out on this project include the extension of the southbound right turn lane by approximately 350m for traffic queuing to turn right onto the M4 Motorway from Carlisle Avenue, providing a dedicated lane for both through traffic and right turning traffic. Works also include 290m of concrete kerb and gutter, 400m2 of pedestrian shared footpath and driveway, 160m of 375mm diameter RC pipe and drainage pits. Construction of 800m2 of asphalt paving

COMPLETION DATE: 2015
CLIENT: RMS