Intersection upgrade of Parramatta Road and Shaftsbury Road to duplicate the right hand turn lane from Parramatta Road (city bound) to Shaftsbury Road and duplicate the southbound through lane on Shaftsbury Road to provide additional vehicle capacity.
Widening of Parramatta Road between Luke Ave and Loftus St, adjacent to Concord Oval.
Key Project details:
- 90% of work completed at night
- Full reconstruction of traffic signals/posts
- Remove and dispose 1100m3 of spoil
- 300LM of drainage pipe installed on Parramatta Road and Shaftsbury road (375mm – 750mm)
- High Early Strength Concrete used for new and existing road pavement (300m3)
- Complex relocation of Sydney Water mains, Jemena Gas, Ausgrid HV, NBN, Telstra and Optus
- 6000m2 of Mill and Asphalt resheeting works
- Complex staged traffic management in Urban Environment AADT >50,000 vehicles per day
- Works completed outside busy 7/11 Petrol station with 24hour access required at all times: TfNSW Bus depot all requiring 24hour access.
- 40,000 manhours on site with zero LTI’s.